MRT Line 5

MRT Line 5

  • Length : 35km
  • Route : Bulta – Badda – Mirpur Road – Mirpur 10 – Gabtoli Bus
  • Terminal – Dhanmondi – Bashundhara City – HatirJheel Link
  • Estimated Cost :  BDT 332,437 million
  • Feasibility Study Planned : 2015-2016 (pre-feasibility completed)

This 35-kilometer-long MRT line will serve the eastern and western suburbs of Dhaka crossing a cantonment area. There are 9 multimodal stations including major interchange facilities at the station of Circular Waterway (Gabtoli and others). Depot/workshop and stabling area will be located at the eastern part of RAJUK area. Until the MRT Line 5 is operational in 2035. But east-west corridor is very important, so the short term corridor passenger demand will be served by northern part of this line.

 

Alignment of MRT Line  5 corridor
Alignment of MRT Line 5 corridor